Skip to content
AlFursan AlOula security team and patrol vehicles at a project site gate

Industry 02

Major Projects & Infrastructure

Material and contractor control on active sites, with phased mobilisation as the project grows.

Typical security requirements

The requirement mix below is typical for this environment. The final post structure is confirmed after a site assessment.

  • Site guarding
  • Access control
  • Contractor access
  • Vehicle movement control
  • Security patrols
  • Field supervision

Relevant clients

Shown only where the operating environment is verified. Contract details, site information and personnel numbers remain confidential.

  • NEOM logo
  • Diriyah logo
  • BEC Arabia logo
  • Dar Al Riyadh logo
  • NAS Joint Venture logo
  • Binyah logo
  • Jazal Group logo

Request security for this sector

Tell us about the site and we will define the personnel profile, supervision and vehicles it needs.

CallWhatsAppEnquiry